25. Control Valve Body Assemble
Control Valve Body Assemble
Notice: Refer to Fastener Notice Fastener Notice.
1. Install the control valve body and the bolts.
Tighten the bolts to 8 Nm (71 lb in).
2. Install the input speed sensor mounting bolt.
Tighten the bolt to 8 Nm (71 lb in).
3. Install the output speed sensor mounting bolt.
Tighten the bolt to 6 Nm (53 lb in).
4. Install the oil pan and the oil pan gasket.
Tighten the oil pan bolts to 6 Nm (53 lb in).