Canister Purge Solenoid: Service and Repair
Purge Control Solenoid ValveREMOVAL
1. Disconnect the ground cable from the battery.
2. Disconnect the connector and evaporation hose of the purge control solenoid valve, then remove the purge control solenoid valve.
INSTALLATION
Install in the reverse order of removal.
Tightening torque (Purge control solenoid valve attachment bolt): 19 N�m (1.9 kgf-m, 14 ft-lb)
NOTE: Connect the evaporation hose as shown in the figure.